For subcontractors

Change order software for subcontractors

Extra work only pays if it’s priced, papered, and signed — and subs do all three from a truck between pours. Planroom’s change order management turns the directive into a clean COR the same day, and tracks it until the money lands.

$149/mo flatNo contractSub-side founder experience
COR-007 · TO GC
Added steel per RFI-023 — grid D
Aging: 3 days
Rebar — 2,100 lb added$4,830
Labor — place & tie, 64 hrs$6,720
Pump & equipment$3,150
Backup: directive · photos · RFI-023Attached
COR total$16,400
Submitted, time-stamped, visible until signedTrack it
The sub problem

Extra work is easy. Getting paid for it isn’t

🤝

The verbal go-ahead

“Just get it done, we’ll square up later.” Later arrives, memories differ, and the sub who did the work is negotiating from a handshake.

🛻

Pricing from the tailgate

The change needs a number today, but the takeoff is in the office and the crew is already moving. Slow pricing becomes no pricing becomes eaten scope.

🕳️

The COR black hole

Submitted three weeks ago. No signature, no rejection, no answer — and the work’s long done. Every silent COR is your money earning interest for someone else.

📉

The end-of-job write-off

Closeout arrives with a stack of unsigned changes, and “let’s settle up” becomes a discount you never agreed to. Weak records negotiate weakly.

Features

Directive to deposited

Price it the same day

Build the COR from line items on a phone — materials, labor, equipment, markup — while the directive is fresh and the crew is still there.

📸

Evidence attached

The directive, the photos, the daily report entry that flagged it, the RFI that caused it — the entitlement story assembled automatically.

📤

Clean packages, faster signatures

GCs sign faster when the COR answers their questions — priced clearly, backed up, referenced. Make approval the easy path.

⏱️

Aging on every COR

Days-outstanding visible on every submitted change — your follow-up list, and your record when response time becomes the story.

📒

The outstanding-money log

Every COR — pending, approved, paid — on one log with totals. Walk into closeout knowing your number to the dollar.

✍️

E-signature on the record

Signed changes, time-stamped, with the full thread behind them. Paper that holds when someone tests it.

Keaton Bandhoesingh

Built from the sub’s chair too. Keaton Bandhoesingh, Founder — preconstruction across an eight-figure concrete business, with $100M+ directly awarded over his career. Submitting CORs, chasing signatures, and defending entitlement to GCs was his actual week — the changes that got papered fast got paid; the ones that didn’t got negotiated. Read the story →

See it work

Extra work, papered before the pour

StepWhat the record showsStatus
RFI answer adds 2,100 lb of steel at grid DRFI-023 flagged for cost impact when askedChange spotted
Owner’s rep confirms direction on siteDirective noted in that day’s report, photos attachedDocumented
COR-007 priced from line items, same day$16,400 with backup assembled automaticallySubmitted
Aging visible at 3 daysFollow-up made with the record, not a grudgeSigned day 5
Next pay app includes the changeLog ties out — nothing eaten, nothing forgottenPaid
Pricing

One price. Everything included.

$149/mo
billed monthly · no contract · cancel anytime
Get started
  • Unlimited CORs & change orders
  • Whole crew included — no per-seat fees
  • The full platform: docs, daily reports, submittals, RFIs & bidding

Prefer paper for now? Grab the change order template. Working with a GC on their side of the flow? Show them change order software for GCs.

Questions

Good to know

How does this get my change orders approved faster?

By making approval the easy path: a COR priced line by line, with the directive, photos, daily report entry, and originating RFI attached, answers the GC’s questions before they’re asked. Clean packages move; vague ones sit.

What about verbal directives?

Document them the same day: note the direction in the daily report with who gave it, then price the COR while it’s fresh. A contemporaneous record of a verbal directive is dramatically stronger than a recollection at closeout. (General information, not legal advice — your contract’s notice provisions govern.)

Does the GC need Planroom too?

No — your CORs export as clean PDFs to send however the GC wants them, and your record stays yours either way. If the GC is on Planroom, the whole flow gets smoother still.

Can I track T&M work?

Yes — capture the labor, equipment, and materials as they happen (your daily reports are the backbone), then roll them into a priced COR instead of a pile of tickets nobody reconciles.

How much does it cost?

$149 a month for the entire platform. No setup fee, no per-seat pricing, no contract — less than one hour of eaten extra work.

Stop donating extra work.

Get started in minutes. $149/month when you’re ready. No contract, no sales call.

Get started →