Change order software for general contractors

GCs live in the middle of every change — sub CORs coming up, owner COs going out, markup in between, and backup documentation demanded at the top. Planroom’s change order management runs both directions of that flow on one record.

$149/mo flatNo contractGC-side founder experience
CO-012 · TO OWNER
Riverside Medical — added steel, grid D
Backup attached
COR-007 — concrete sub$16,400
GC overhead & profit (10%)$1,640
Bond & insurance$1,866
Backup: RFI-023 · S-201 Rev 3 · sub pricingAttached
CO total to owner$19,906
Sub-side and owner-side, one threadSend for signature
The GC problem

You’re the middle of every change

📥

Fifteen subs, fifteen formats

CORs arrive as PDFs, spreadsheets, and phone numbers — each priced differently, none matching your owner CO format. Reconciling them is a job nobody billed for.

🧾

The backup documentation demand

Owners don’t sign five-figure COs on trust — they want sub pricing, the RFI, the drawing revision. Assembling that package from email threads is where approvals go to stall.

🔀

Two logs that never tie out

What you owe subs and what the owner owes you should reconcile to the penny. Kept in separate spreadsheets, they never do — and the gap is your margin.

✍️

Work proceeding on a handshake

The owner’s rep said go, the sub started, and the paperwork is three weeks behind the work. Every unsigned change is exposure with your name on it.

Features

Both directions, one record

📥

Sub CORs in one place

Change order requests land in the project, not your inbox — priced line by line, time-stamped, ready to review and roll up.

🧮

Roll-up with markup

Build the owner CO from sub pricing with your OH&P applied — the math handled, the trail from sub number to owner number preserved.

📎

Backup that assembles itself

The sub’s pricing, the RFI, the drawing revision — attached to the CO because they were already linked on the record. The owner’s package in minutes.

✍️

E-signature both directions

Owner COs and sub COs routed for signature with status visible — no more “did they sign yet?” as a project management system.

📒

A log that ties out

Sub-side and owner-side on one log — pending, approved, paid — reconciled automatically against the contract value. Your CO log, but it maintains itself.

🕐

Audit trail end to end

Who priced what, who approved when, what backup was attached — time-stamped for the owner’s auditor, the sub’s dispute, or your own memory.

Keaton Bandhoesingh

Built from the GC’s chair. Keaton Bandhoesingh, Founder — former preconstruction director at a general contractor and precon lead on Walmart and retail programs, with $100M+ directly awarded across a 7-year career. The fight that started this product was a GC fight: getting change order backup documentation to the client in a form they’d approve. Read the story →

See it work

Sub COR to signed owner CO, one thread

StepWhat the record showsStatus
Concrete sub submits COR-007 for added steel$16,400, priced line by line, citing RFI-023Received
GC reviews against the RFI answer & Rev 3Everything already linked — review takes minutesApproved to roll up
Owner CO-012 built with OH&P$19,906, backup package attached automaticallySent for signature
Owner signsE-signed, logged, contract value updatedExecuted
Sub CO issued back downBoth logs tie out to the pennyClosed
Pricing

One price. Everything included.

$149/mo
billed monthly · no contract · cancel anytime
Get started
  • ✓Unlimited change orders, both directions
  • ✓Every sub included — no per-seat fees
  • ✓The full platform: docs, daily reports, submittals, RFIs & bidding

Working with subs on their side of the flow? Send them change order software for subcontractors.

Questions

Good to know

How does Planroom handle the sub-to-owner CO flow?

Sub CORs come in priced and time-stamped, you review and approve, then roll them into an owner CO with your markup applied — backup attached automatically because the RFI, drawing revision, and sub pricing were already linked on the record. When the owner signs, the sub CO issues back down and both logs reconcile.

Can it handle markup and OH&P?

Yes — apply your overhead and profit when rolling sub pricing into the owner CO, with the trail from the sub’s number to yours preserved. What your contract allows for markup is between you and your contract; Planroom just does the math and keeps the record.

What backup documentation gets attached?

Whatever the record already holds: sub pricing, the originating RFI, the drawing revision, daily report entries, photos. Owners approve faster when the package answers their questions before they ask.

Do my subs need their own accounts?

They participate in your projects at no per-seat cost — submitting CORs, signing COs, pulling current documents. No meter punishing you for keeping every trade on the record.

How much does it cost?

$149 a month for the entire platform. No setup fee, no per-seat pricing, no contract.

Run every change from the middle.

Get started in minutes. $149/month when you’re ready. No contract, no sales call.

Get started →