Built by a contractor, for contractors

Change order management software built for GCs and subs

Price it from line items, route it for e-signature, and keep the record that gets you paid. No annual contract, no sales call — half the ceremony of the enterprise tools, none of the email chaos.

$149/mo flatNo contractNo sales call$100M+ awarded founder
CO-012 · ISSUED TO OWNER
Riverside Medical — Phase 2
Pending approval
Added structural steel — grid line D$8,400
Concrete, additional footing$3,150
Labor — 2 crew, 3 days$5,760
Markup (15%)$2,596
Change order total$19,906
Routed to owner for signatureApprove & sign
The problem

Where change orders leak money

Every unpaid change order dies the same four deaths. You’ve seen all of them.

🤝

The verbal “go ahead”

The work happens, the paper never does — and months later it’s a five-figure argument about what was authorized.

📧

The buried email

The CO went out three reply-alls ago as version 2 of 4. Nobody agrees which number is current, and the approval clock silently stops.

🧮

The memory-priced change

Under schedule pressure the change gets priced from memory. Missed equipment, missed markup — the margin is gone before it’s approved.

📉

The log that doesn’t exist

At closeout, original contract plus approved changes has to tie out. If the log is stale, closeout becomes forensic accounting.

Features

Everything a change order needs to get paid

🧾

Line-item pricing

Labor, material, equipment, subcontract, markup — totals calculate themselves, markup set per CO to match your contract. Itemized COs get approved faster.

✍️

Routing & e-signature

One link, one current document, signed from any device — time-stamped and attributed. No attachments, no version confusion, no chasing.

👁️

Exposure at a glance

Every CO carries a status across every job. The sum of your pending COs is unapproved money at risk — now you can actually see it.

📒

Automatic CO log

Every change order lands in a live log with running totals that reconcile against the contract continuously. Closeout becomes a report.

🗂️

Audit trail + PDF export

Creation, edits, routing, approval — all logged. Export any CO or the whole log as a clean PDF for closeout or a dispute file.

🔗

Connected to your documents

The RFI that triggered the change, the revised drawing, and the CO all reference each other — one platform, one record.

Keaton Bandhoesingh

Built by a contractor, not a software company. Keaton Bandhoesingh, Founder — preconstruction manager across three construction firms with $100M+ directly awarded in a 7-year career. Planroom started because Keaton was living this exact problem: chasing a change order chain with a GC client and fighting to get backup documentation to the owner. Read the story →

See it work

A real change, priced in minutes

Mid-project, the engineer revises grid line D and adds steel. Here’s the CO, itemized — the owner approves steel they can see on a drawing, not a mystery number:

Line itemDetailAmount
MaterialAdded structural steel per revised S-201$8,400
MaterialConcrete, additional footing$3,150
Labor2-person crew, 3 days$5,760
Markup15% overhead & profit (per contract)$2,596
Change order total — +4 working days$19,906
Comparison

Planroom vs. the alternatives

PlanroomClearStoryEmail + ExcelProcore
Built for small & mid-size GCs and subs✓ YesEnterprise focus—✗ Enterprise
Line-item CO pricing✓ Built in✓ YesManual✓ Yes
E-signature routing✓ Included✓ Yes✗ No✓ Yes
Automatic CO log & audit trail✓ Automatic✓ YesManual, stale✓ Yes
Self-serve signup✓ get started todaySales-led demo✓✗ Implementation
Price$149/mo, publishedNo-cost basic; paid = quote$0 (paid in margin)Custom quote

Honest deep-dives: Planroom vs. ClearStory · Planroom vs. Procore

Who it’s for

Both sides of the change order

🏗️

General contractors

Manage COs in both directions — up to owners, down to subs — with exposure visible across every job.

Change order software for GCs →

👷

Subcontractors

Get extra scope priced and signed before the crew starts — so the paperwork never lags the labor and you stop eating changes.

Change order software for subs →

Pricing

One price. Everything included.

Most change-order tools hide pricing behind a sales call and an annual contract. We just tell you.

$149/mo
billed monthly · no contract · cancel anytime
Get started
  • ✓Unlimited change orders
  • ✓Line-item pricing & markup control
  • ✓Routing, e-signature & audit trail
  • ✓Automatic CO log with running totals
  • ✓Document control, submittals & RFIs included
  • ✓GCs and subs — every feature, no per-seat pricing

Not ready for software? Grab the change order template and change order log — or start with what is a change order.

Questions

Good to know

What is change order management software?

Software that runs the full lifecycle of a construction change order — pricing it from line items, routing it for approval and e-signature, tracking its status, and keeping every CO in a project log with an audit trail. One system instead of a Word form, an Excel price sheet, an email chain, and a log nobody updates.

How much does Planroom cost?

$149 per month, billed monthly, published right here. Every feature, unlimited change orders, no setup fee, no per-seat pricing, no annual contract. Start with no credit card and no sales call.

Is a change order legally binding?

When properly executed — in writing, signed by parties with authority under the contract — a change order amends the contract itself. That’s why signatures and documentation matter. (General information, not legal advice; your contract’s changes clause governs.)

What’s a typical markup on a change order?

Commonly in the 10–20% range for overhead and profit, and many contracts cap it explicitly. Planroom lets you set markup per change order so the math always matches your contract terms.

Do I need software, or is the AIA G701 form enough?

G701 is a fine form — but it doesn’t price the change, chase the signature, show what’s outstanding across a project, or keep the log that ties out at closeout. Software manages the lifecycle; the form is just the paper at the end of it.

Do GCs and subs both use Planroom?

Yes — usually for mirror-image reasons. GCs manage COs in two directions and need exposure visible across every job. Subs need extra scope approved before the work happens so they don’t eat it.

Can I try it before paying?

Yes. Start with no credit card and no sales call; pay $149/month when it’s earning its keep. Cancel anytime.

Put your next change order on the record.

Start in minutes. $149/month when you’re ready. No contract, no sales call.

Get started →