Built by a contractor, for contractors

Construction document control software that holds up under audit

Version control, distribution with proof, and a complete chain of custody on every drawing and document — so when someone asks “who had what, when,” the answer is a record, not a memory.

$149/mo flatNo contractNo sales call$100M+ awarded founder
S-201 · DOCUMENT HISTORY
Chain of custody
Complete
Rev 3 uploaded (K. Bandhoesingh)Jun 14 · 9:02 AM
Distributed — transmittal T-03114 recipients
Rev 2 superseded & archivedJun 14 · 9:03 AM
Downloaded by concrete subJun 14 · 11:47 AM
Every actionLogged
Exportable audit report, any document, any timeExport
The problem

Loose documents fail exactly when it counts

Document control isn’t filing. It’s the discipline that decides disputes, audits, and back-charges.

“Who changed this?”

A detail is different from what everyone remembers, and there’s no history: no who, no when, no prior version. Now it’s an argument instead of a lookup.

📮

Distribution you can’t prove

The sub says they never got Rev 3. You’re pretty sure you emailed it. “Pretty sure” against a signed back-charge dispute is a losing hand.

👻

Superseded sheets still circulating

The old revision didn’t die when the new one arrived — it’s still on a clipboard, in a subfolder, on someone’s phone. Uncontrolled copies are rework generators.

🏛️

The audit scramble

An owner — or on public work, an agency — asks for the document record. If assembling it takes a week of inbox archaeology, the record is already telling them something.

Features

Control that runs itself

🔄

Revision control, enforced

One current version per document, always. New revisions supersede automatically; the old version archives with its full history — never deleted, never ambiguous.

📤

Controlled distribution

Documents go out through logged transmittals — what, to whom, when. Every send creates the proof you’ll want when distribution is questioned.

🧾

Chain of custody

Uploads, revisions, distributions, downloads — every touch on every document, time-stamped and attributed. The complete story of a drawing’s life.

🗄️

Superseded archive

Prior revisions stay accessible and clearly marked — so you can always show what was current on any given date. That’s the question disputes actually turn on.

📊

Exportable audit reports

Pull the document record for any sheet, set, or project as a clean report — for an owner, an agency, or a dispute file. Minutes, not a week.

🔗

Connected workflows

Part of the same record as your document management, change orders, and RFIs — the controlled document and the decisions built on it, one thread.

Keaton Bandhoesingh

Built by a contractor, not a software company. Keaton Bandhoesingh, Founder — preconstruction manager across three construction firms with $100M+ directly awarded, including Prime 4 Services, an MBE government contracting firm — where document control isn’t a preference, it’s a contract requirement with teeth. The discipline public work demands is what this module gives every job. Read the story →

See it work

A dispute, over in minutes

The owner questions whether the concrete sub had Rev 3 before the grid D pour. Here’s the lookup:

QuestionWhat the record showsSource
When did Rev 3 become current?Uploaded Jun 14, 9:02 AM — Rev 2 superseded same minuteRevision history
Was it distributed?Transmittal T-031, 14 recipients, Jun 14Distribution log
Did the sub receive it?Downloaded by the sub, Jun 14, 11:47 AMAccess log
Did they work from it?Their RFI-023 cites Rev 3 directlyLinked record
Total time to answerFour clicks, one exportDone

That conversation ends in minutes with a record — or runs for months without one.

Comparison

Planroom vs. the alternatives

PlanroomEmail + shared drivesEnterprise platforms
Enforced revision control✓ Automatic✗ Copies drift✓ Yes
Provable distribution✓ Logged transmittals✗ “Pretty sure I emailed it”✓ Yes
Chain of custody & audit export✓ Any document, minutes✗ Inbox archaeology✓ Yes
Self-serve signup✓ Start today✗ Sales-led
Implementation costNone — minutesCommonly $10,000+
Price$149/mo, published$0 (paid in disputes)Custom quote
Who it’s for

Whoever answers for the record

🏗️

General contractors

Prove distribution to every trade, defend back-charges with access logs, and hand owners an audit-ready record instead of a scramble.

Document control for GCs →

👷

Subcontractors — especially on public work

Keep your own chain of custody: what you received, when, and what was current when you built. On government projects, that record is often contractual — on every project, it’s protection.

Pricing

One price. Everything included.

Document control plus the whole platform — document management, change orders, daily reports, submittals, and RFIs.

$149/mo
billed monthly · no contract · cancel anytime
Get started
  • Enforced revision control & superseded archive
  • Logged transmittals & access history
  • Exportable audit reports
  • Change orders, daily reports, submittals & RFIs included
  • No setup fee, no per-seat pricing

Building the discipline first? Start with the document control process and the transmittal template.

Questions

Good to know

What is construction document control software?

Software that enforces the disciplined side of project documents: one current version per document, controlled distribution with logged transmittals, a complete access history, and audit-ready reporting. The point is provability — being able to show who had what, when, on any document in the project.

How is document control different from document management?

They overlap heavily. Document management is the broad practice of organizing, versioning, and distributing project documents; document control is its strict enforcement layer — the chain of custody, the superseded archive, the audit export. Planroom does both in one system, so the distinction is academic in practice.

What is chain of custody for documents?

The complete, time-stamped history of a document’s life: who uploaded it, when it became current, who it was distributed to, who accessed it, and what superseded it. It’s the difference between asserting your document story and proving it.

Do government projects require document control?

Public work commonly carries explicit documentation and records requirements in the contract — submittal registers, distribution records, retention rules. Requirements vary by agency and contract, so yours governs — but showing up to public work without controlled documents is showing up unprepared.

How long should document records be kept?

At least through your state’s statute of repose — commonly 6–10 years after completion — because latent-defect claims surface long after closeout. Storage is cheap; the record you deleted is the one you’ll need. (General information, not legal advice.)

How much does it cost?

$149 a month for the entire platform — document control and management, change orders, daily reports, submittals, and RFIs. No setup fee, no per-seat pricing, no contract.

Make your record unimpeachable.

Get started in minutes. $149/month when you’re ready. No contract, no sales call.

Get started →